ARC, the Adaptable Registry for Carbon

Issue, authorise and account for your country’s carbon units on a record anyone can check.

ARC is the registry a Designated National Authority runs itself. It takes a mitigation project from concept note to issued units, records Article 6 authorisations and corresponding adjustments, and keeps every movement on a hash-linked ledger, with a public portal on top.

The demo is a fully populated registry for a fictional Country X. The playground is a sandbox that resets every day.

Each record carries the fingerprint of the one before it, from concept note to the public record, so a changed entry breaks the chain.

Who uses the registry

  • Governments and DNAs

    Approve projects, authorise units for international transfer, apply corresponding adjustments and prepare reports to the UNFCCC. One registry per deployment, on infrastructure you choose.

  • Project developers

    Submit concept notes and design documents, answer review comments, pay fees, report monitoring results and follow each project’s milestones.

  • Market participants

    Open a holding account after identity checks, receive and transfer units, and check any serial number on the public portal.

Key features of the carbon registry

What the registry does today, and what is ready to switch on when an outside body opens its side. Each feature carries its status.

In the registry
built and tested
Ready for connection
built on our side, waiting on the other party
Planned
designed, not yet built

Control and approval

The full project lifecycle

In the registry

Concept note, project design document, implementation, monitoring and issuance, each with review, return for changes and approval, and committee review where your process calls for it. A project cannot file for a stage it has not reached.

Four-eye approvals

In the registry

Cancellations, account suspensions, authorisations, transfer completion and ledger corrections each wait for a second officer. The officer who asks cannot confirm, the database enforces it, and unconfirmed requests expire after 72 hours. Switching a control off needs a second officer too.

Integrity

A tamper-evident ledger

In the registry

Every unit movement and record version is appended, never edited, and carries a SHA-256 hash linked to the one before it. Verification recomputes the chain independently, and scheduled checks look for broken invariants.

Published daily anchors

In the registry

Each day the head of the chain is anchored and published. Anyone can download the anchor receipts without signing in. Independent RFC 3161 timestamping can be switched on.

Article 6

Authorisation

In the registry

Register cooperative approaches and issue versioned authorisations with the content decision 4/CMA.6 asks for. Extensions, reductions and revocations become new versions, so the history is never overwritten.

First transfers and corresponding adjustments

In the registry

A first-transfer engine applies the trigger your authorisation sets, then records the corresponding adjustment against your emissions balance and NDC, alongside the carbon budget and any Adaptation Fund transfer.

AEF reporting

In the registry

Generate the Agreed Electronic Format tables 1 to 5 as a workbook, the initial report and the annex to your biennial transparency report, straight from the ledger. The template follows the current draft and will track the final version.

UNFCCC international registry hub

Ready for connection

The hub client is built and tested, with signed requests, TLS 1.3 and a full message log. It connects once the secretariat opens access. Until then, officers record each exchange with evidence, and a second officer confirms it.

Transparency

Public transparency portal

In the registry

A separate, read-only site shows approved projects and their design documents, registry totals, Article 6 activity and the ledger anchors, without an account.

Unit verification

In the registry

Anyone can enter a serial number and see the unit’s status, vintage, type and project. Holders and quantities are never shown.

CAD Trust publication

Planned

Designed to publish project and unit data to the Climate Action Data Trust, starting on its test network, and only after the DNA records its decision to publish.

Operations

Modular profiles

In the registry

Start with a domestic registry and add the Article 6 modules when your country is ready. Modules are chosen per deployment, and the services refuse to start with an inconsistent set.

Fees and payments

In the registry

Set fees for concept notes, design documents, issuance, transfers and corresponding adjustments. Payers upload proof of payment and officers verify it; refunds always need a second officer. A national payment gateway plugs in through a documented adapter.

Example process flow

How one mitigation project moves through the registry, in the order the registry enforces. Steps 6 and 7 apply when the Article 6 modules are on.

Who acts at each step is named under it.

  1. Concept note

    The developer submits a project concept note and pays the application fee. Officers review it, return it for changes or approve it.

    Developer, registry officers

  2. Project design document

    The full design document goes through technical review, with committees or review panels where needed. Approval issues a serialised letter of approval.

    Developer, reviewers, DNA

  3. Implementation

    The project starts work and records implementation details, community agreements and supporting documents.

    Developer

  4. Monitoring

    The developer reports monitoring results with signed declarations and technical and financial performance, and officers review them.

    Developer, registry officers

  5. Issuance

    After the issuance review, units are issued with unique serial numbers into the developer’s holding account, with any buffer contribution set aside.

    Registry officers, second officer

  6. Authorisation

    The DNA authorises mitigation outcomes for international use under a cooperative approach, as a versioned record.

    DNA, second officer

  7. First transfer and corresponding adjustment

    When the authorisation’s trigger is met, the first transfer is recorded and the corresponding adjustment is applied and queued for AEF reporting.

    Registry, DNA

  8. Transfer, use or cancellation

    Units move between holding accounts or are used or cancelled for good, each movement confirmed by a second officer where the rules require it.

    Account holders, registry officers

  9. Public transparency

    The approved project, the unit’s status and the day’s ledger anchor appear on the public portal, where anyone can verify a serial number.

    Anyone

Start domestic, add Article 6 when you are ready

ARC is modular. A country chooses a profile when it deploys, then adds or removes single modules as its policy changes.

Domestic

For a domestic or voluntary carbon market run by the DNA.

  • Project lifecycle, from concept note to issuance
  • Tamper-evident ledger and daily anchors
  • Four-eye approvals
  • Holding accounts, transfers and cancellations
  • Fees and payment verification
  • Buffer pool and regulatory compliance checks
  • Public portal and unit verification
  • Analytics and a support desk

Article 6 host

Everything in Domestic, plus what a Party needs to transfer mitigation outcomes internationally.

  • Cooperative approaches
  • Versioned authorisations
  • First transfers
  • Corresponding adjustments and the carbon budget
  • AEF tables, initial report and transparency report annex
  • A public Article 6 page

A wider Article 6 profile adds acquiring units from other Parties and the UNFCCC hub client.